Q: 20101
_________allowed East India Company to reside and build factories inSurat
-
-
Humayun
-
Akbar
-
Shah Jahan
Q: 20102
Muhammad Ali Bogra';s formula was presented to the constituent assembly on __________?
-
March 7, 1952
-
October 7, 1952
-
March 7, 1953
-
Q: 20103
The objective resolution of Pakistan was passed on____________?
-
March 12, 1948
-
August 12, 1948
-
-
August 12, 1949
Q: 20104
Sindh Madrasah-tul-Islam, Karachi was founded by _____________?
-
-
Sir Aga Khan
-
Khalifa Hameeduddin
-
Sir Syed Ahmed Khan
Q: 20105
Dar-ul-Uloom Deoband was founded by __________?
-
Maulana Mehmood-ul-Hassan
-
Maulana Hussain Ahmed Madni
-
Maulana Muhammad Qasim Nanautawi
-
Maulana Rasheed Ahmed
Q: 20106
The Jhimpir Wind Power Plant is located in __________ district.
-
Karachi
-
Badin
-
-
Khuzdar
Q: 20107
The largest source of electricity generation in Pakistan is __________?
-
-
Hydal
-
Wind
-
Solar
Q: 20108
The GSP Plus status will allow Pakistan to export products without duties to __________ European States?
-
25
-
26
-
27
-
Q: 20109
The first president of All India Muslim League were __________?
-
Sir Saleemullah
-
Nawab Waqar-ul-Mulk
-
-
Sir Adamjee Pir Bhai
Q: 20110
The first session of All India Muslim League was presided over by _________?
-
Sir Saleemullah
-
Nawab Waqar-ul-Mulk
-
Sir Aga Khan
-
Q: 20111
The GSP Plus status to Pakistan has been granted till __________?
-
2015
-
-
2019
-
2021
Q: 20112
The Head Office of Institute of Chartered Accountants of Pakistan (ICAP) is in __________?
-
-
Lahore
-
Islamabad
-
Rawalpindi
Q: 20113
Standard and Poor';s (S&P) on 5 May 2015 has raised Pakistan';s credit rating outlook from?
-
negative to stable
-
negative to stable+
-
-
stable to positive+
Q: 20114
Which river does NOT flow from Jammu and Kashmir?
-
Indus
-
Jhelum
-
Chenab
-
Q: 20115
Salt Mine, Khewra is located in _________ district?
-
-
DG Khan
-
DI Khan
-
Gujrat
Q: 20116
Dasu Dam is located in __________?
-
Sindh
-
Punjab
-
Baluchistan
-
Q: 20117
Diamer-Bhasha Dam has been planned on the river _________?
-
-
Jhelum
-
Chenab
-
Sutlej
Q: 20118
The Installed Capacity of Neelum–Jhelum Hydropower Plant is __________ MW?
-
948
-
955
-
962
-
Q: 20119
International Court of Arbitration sets minimum flow of __________ m3/sec into the Neelum River.
-
5
-
7
-
-
11
Q: 20120
The proposed motorway from Gawadar to Kashghar is about __________ km?
-
2600
-
2800
-
-
3200